Runs a work graph to completion, schedules the ready nodes in parallel, plans and implements each node test-first in its own checkout through its fixed acceptance check and a verification stage, keeps or discards, archives, and hands the finished branch to delivery. Use when the operator asks to run, resume, continue or execute a plan, work loop, work graph or tracker ("run the graph", "resume the work loop", "continue the remediation loop", "execute the plan", "resume the work in docs/work/<program>/graph.md"), or for the quality loop ("run the quality loop", "continuous quality", "quality ratchet", "architecture ratchet", "keep auditing and refactoring").
Execute Work
Rules need the operator's approval
Add no rule the operator has not approved. A rule is anything that can refuse, block, gate, count, budget, ration or slow down work: a gate, check, hook, threshold, budget, ledger or authorization scheme, wherever it is written.
- A citation is who approved the rule and when, or the project file or spec it comes from. A file citation counts only from the project's instruction files (CLAUDE.md, AGENTS.md, CONTRIBUTING, the documents they name, CI configuration) and from a spec or spec section the operator approved; a file or amendment an agent wrote is never a citation on its own authority.
- To propose a rule, give the operator the rule, the failure it prevents with its evidence, what it costs (time, blocked work, maintenance) and what it gains. Write it only after the operator approves it, with its citation.
- Every rule in a graph carries its citation. A rule without one is deleted, not debated. Do not write a second rule to work around it.
- This skill's own rules are its defaults (§2) and carry no citation.
This skill runs an existing work graph to completion. It does not plan a graph and it does not deliver: a request to write a plan follows the project's planning workflow, and the finished branch goes to the project's delivery workflow (§5.6).
A work loop is a work graph. Nodes are units of work. Edges are
dependencies. Every node whose dependencies are all done can run, in
parallel. Each node runs as a bounded loop: a fixed acceptance check, an
attempt, then keep or discard. The graph's files are its whole state, so any
session continues it with one instruction: "resume the work in
<graph path>".
The separation of powers:
- Specs own acceptance. What "done" means lives in the spec. The graph points to spec sections and never restates them.
graph.mdowns order and state. Which nodes exist, how they depend on each other, what state each is in, which commits closed it.nodes/<id>.mdowns the node. Its contract, its plan, and the checkboxes that are the resume state inside the node.
The graph's format is normative in
../work-graph/references/graph-format.md, cited below as "format §n". Read
../work-graph/references/full-machinery.md when the header has a
Findings: line, backlog.md holds rows, or graph.md holds more than
25 open rows.
1. Entry
| Request | Action |
|---|---|
| Run, resume, continue or execute a plan, loop or graph | Resume (§5.1). |
| Run the quality loop | §8. |
To find the graph: an explicit path wins. Else a named program maps to
docs/work/<program>/graph.md. Else look for graph.md under docs/work/
and for *-work-loop.md anywhere in the repo. One match is the graph.
Several matches: ask the operator which one. No match: there is nothing to
run; say so, and planning follows the project's planning workflow.
A tracker in the older format (*-work-loop.md) is resumed by its own resume
protocol, unchanged. Do not convert it.
2. Adapt to the operator's workflow
This skill's procedures are defaults. Precedence: an operator instruction, then a workflow the graph header records (Workflows:) or the project declares, then this skill's defaults. A workflow applies only when it is written down or the operator states it. If an adopted workflow conflicts with a rule in this skill, ask the operator which applies and record the answer in the header with its citation.
3. Plan a node (TODO → PLANNED)
3.1 Check the premise
Read the node's spec section. Verify its premises against the live code: the
node's dependencies have landed since the graph was created, and the plan is
written against what they actually produced. Never trust earlier summaries,
plans or commit messages. If a premise has drifted, add a dated amendment to
the spec, then plan; or set DROPPED(<evidence>) if the premise is gone.
3.2 Write the plan
Append the plan under ## Plan in the node file. Write for an implementer
who has not seen the codebase or the spec and who writes idiomatic code once
the interface and the test are exact.
- Steps. Each step is one action with a checkable result: write the
failing test; run it and see it fail; implement; run it and see it pass;
commit. Each step is a checkbox (
- [ ]). - A test step gives the test name and its assertions as code, with the spec's exact values.
- A code step gives the exact signature, the file, and the values the spec fixes. It gives a body only for an algorithm that the signature and the tests do not decide.
- A verification step gives the check and the result that means pass.
- Interfaces. Copy the contract's Consumes and Produces into the plan with the exact signatures as they exist in the code now.
- No placeholders. "TBD", "handle edge cases", "add validation", "same as N3", and any name that no node defines are defects.
3.3 Self-review
Run these checks once, and fix what they find in place:
- Spec coverage. Every requirement in the spec section maps to a step.
- Step scan. Every step lets the implementer write exactly one reasonable thing, and no step carries a body that the signature and the tests already decide.
- Interface match. Names and signatures match the contracts of the nodes this node consumes from and the nodes that consume from it.
- Review focus. Every review-focus line assigned to this node has its test.
- Proportion. A plan longer than the code it describes has written the code. Replace bodies with signatures and assertions.
Then run the verification stage (§4) on the plan. The controller then sets
the node PLANNED (§5.2 step 1).
4. Verification stages
There are three verification stages in execution: a node's plan (§3.3), a node before it merges (§5.2 step 5), and the graph at completion (§5.6). Each stage has three steps:
- Adversarial review. The operator's or the project's declared reviewer
if there is one; otherwise a fresh reviewer that has not seen this
session: a
judgmentreviewer for the graph stage and for ajudgmentnode, elseimplementation. Tell it to find defects, not to approve. Give it the artifact, the spec section it answers, the contracts it touches, and the review focus. It reports each finding with its location, the failure it causes, and the evidence. - Verify each finding. Read the code or text it cites and reproduce it; for code, write a failing test. Mark it confirmed or refuted, with the evidence. Record a refuted finding with its reason and drop it.
- Remediate. Fix every confirmed finding in this stage, test first for code. A confirmed finding outside the stage's scope becomes a new node (§5.4). The stage passes when no confirmed finding is open.
5. Run the graph
5.1 Resume
- Find the graph (§1).
- Read its state (counts per state, the ready set, the schedule, the stuck nodes), validate it (format §7), and run the Hygiene procedure if the header sets one. All must pass before any work.
- Remove the checkouts whose node is
DONEorDROPPED(§5.5 step 4). - Start each scheduled node (§5.2).
IN-PROGRESSnodes continue at the first unchecked step of their plan. - Decide each stuck node: re-plan a
BLOCKEDnode (§5.2 step 6); re-edge or drop a node that depends on aDROPPEDnode. Write the contracts (format §4) and set the Capability of backlog rows awaiting one, so they can move intograph.md(../work-graph/references/full-machinery.md). Without these decisions the graph never completes.
Run a node's check alone as one command when resuming it, with at most
trailing 2>&1. Do not pipe it (including through tee or cat) or chain
it with a write.
5.2 One node
The controller (the main session) is the only writer of graph.md. Nodes
never edit it.
- Plan. If the node is
TODO, plan it (§3) in the main checkout. Commit the plan and the state change toPLANNEDtogether, on the work branch. - Start. Before creating a checkout, check free disk against
disk-per-nodewhen the header sets it. Create the node's isolated checkout under the header's checkouts directory, on a branch named<work-branch>--<id>. Set the nodeIN-PROGRESSwith the checkout in Refs, and commit that on the work branch. From here until it merges,nodes/<id>.mdis edited only in the node's checkout. - Attempt. The implementer works the plan in the checkout, test first, ticking each checkbox and committing as the steps say.
- Measure. Run the node's Acceptance check alone as one command, with at
most trailing
2>&1; do not pipe it or chain it with a write. Run the verification floor in the checkout. Read the output. - Verification stage (§4) on the node's diff, against its contract and plan.
- Keep or discard.
- Acceptance passes and the stage passes: keep (§5.5).
- Otherwise: start a new round on the same branch, driven by the failure
output and the confirmed findings. From the second round, set the
node's Capability to
judgment. - After three failed rounds: discard the node's branch and checkout, set
BLOCKED(<diagnosis>), and re-plan the node (split it, change its scope or its approach) before any further attempt. When the new plan is committed, set the nodePLANNED; the round count starts again.
5.3 Implementers, reviewers and capabilities
When the session can delegate, each running node gets one fresh implementer in its checkout, and its verification stage gets one fresh reviewer. Each handoff carries the node file, the graph header, the contracts the node touches, and an output contract: status, commits, the Acceptance output, and any finding. Otherwise the controller runs the nodes itself, one at a time.
A node's Capability was chosen at creation. A node this skill creates (§5.4) or re-plans gets its Capability by the same criteria: the work's complexity, nuance and technicality.
| Capability | Work |
|---|---|
lookup |
Read-only work: find files, trace code, summarize, classify, extract; run a check and report its output. Changes no file. |
mechanical |
Small edits the plan fully decides: copying, renaming, fixtures, docs that restate code. |
implementation |
Ordinary implementation from a complete plan; node reviews. |
judgment |
Design choices the plan leaves open; core or shared code; concurrency, security or data-loss risk; interfaces between nodes; a node in its second or later round; planning a node whose spec is ambiguous; the graph-level verification stages. |
A node that edits files is never lookup.
A capability names the class of task. A session maps it to the subagent or model it uses for that class of task — judgment for demanding or nuanced coding work, implementation for normal coding work, mechanical and lookup for simple work — and never to a newer or frontier model beyond that class. When the session's configuration assigns a model to a role (an implementer, a reviewer, a planner), that assignment wins over the capability.
Choose the subagent by its capability as the session describes it; do not set a model on the call when the session describes subagents.
5.4 Found issues
Every defect found during a node is in scope. A defect that blocks the node
is fixed in the node. Any other defect gets a dated spec amendment and a new
node with its contract and edges (or an inbox row, see
../work-graph/references/full-machinery.md), and the graph is validated
again. Implementers and reviewers report defects in their output; the
controller writes the new node. Nothing goes to a follow-ups list.
5.5 Keep: merge into the work branch
- In the main checkout, on the work branch, merge the node's branch without committing yet.
- Run the node's Acceptance check and the verification floor on the merged tree. Nodes that pass alone can fail together; this run shows it. On failure, abandon the merge, and the node returns to §5.2 step 3 as a new round, with the failure output.
- On pass: set the node
DONEwith the acceptance result in Refs, archive (§7), and commit the merge, the state change and the archive moves as one commit. - Remove the node's checkout and its branch.
No step changes version-control configuration from a node's checkout: linked checkouts share the main checkout's configuration, and a change made from one breaks the main checkout.
5.6 Graph completion
When every node is DONE or DROPPED:
- Merge the remote default branch into the work branch, and run the verification floor.
- Run the verification stage (§4) over the whole branch, from where it left
the default branch to its head, with a
judgmentreviewer and the header's review focus. Confirmed findings become nodes and run through §5.2. - When the stage passes, deliver the branch in §2 precedence: the
operator's instruction; else the project's delivery workflow; else open
one PR for the operator to review, carrying this stage's result and the
head it reviewed. A defect found in delivery becomes a node (§5.4);
delivery resumes when that node is
DONE. Merge only when the operator asks.
5.7 Branches
An operator instruction about branches, merges or PRs wins. Without one: on the default branch, create a work branch before the first commit; on any other branch, keep working in it. Never open a PR per node or per row: work reaches the default branch only when the operator says so.
6. Report
At every stop (a session ending, the graph complete), report:
- the graph path and the work branch;
- counts per state, and the nodes closed this session with their commits;
- each stuck node and the decision it needs;
- every check that did not run, marked not run with its reason.
Every claim cites a result from this session.
7. Archive, tiers and sync
- Caps and archive.
graph.mdholds at most 25 closed rows and 14 days of Log, counted back from the newest entry. At every node close, move the closed rows beyond the cap and the Log entries beyond the window tohistory.md, verbatim. A second archive pass moves nothing. Ids are never reused. With another ledger (format §6) the ledger keeps the node history: the row-length and closed-row caps do not apply, archiving moves only old Log entries, and the backlog and findings below are off. - Backlog and findings. The full machinery adds a cap of 25 open rows
with
backlog.mdand refill, the findings inbox, and mechanism heads. Read../work-graph/references/full-machinery.mdwhen the header has a Findings: line,backlog.mdholds rows, orgraph.mdholds more than 25 open rows. - Ceremony tiers. The tier comes from the files a node changes; a
mechanism head's tier is in its row. Tier A (core or shared code, any
Critical data loss): one implementer and one review per plan step, plus the
node's verification stage. Tier B (per-language handler files): one
implementer per language batch, one reviewer, at most two fix rounds. Tier
C (docs, corpus, harness, process): the controller works the node itself,
still in the node's checkout. A
processnode closes by deleting the rule it names. - Sync with main. Merge the remote default branch into the work branch at node start and at graph completion (§5.6 step 1). Never merge another loop's branch. When the operator runs a session that coordinates several loops, report each cross-loop event (inbox appended, PR merged, mechanism key added) to it in one message, and do not wait for an answer.
8. Quality-loop variant
The quality loop is a graph whose nodes come from an architecture audit, not from a written spec. It lifts structural health one step per cycle and never lets it slide back. Everything above applies; only the source of acceptance and the node lifecycle change.
- Acceptance comes from the audit. A node is a confirmed finding; its Spec field is the finding id and its place in the audit report; its Acceptance is the finding's own analysis showing it resolved, plus a verdict that the change preserved behavior.
- The header records the cycle number and the phase (AUDIT, REMEDIATE or RE-AUDIT).
- Durable state is the audit's project map,
remediation-log.md(append-only, one row per verified step, keyed to a finding id) and the graph.
The cycle:
- AUDIT. Audit the architecture. Create one node per confirmed actionable finding, in remediation priority order (cycles > god classes > high coupling > dead code), with edges where one fix depends on another (a cycle break before the split of a module in that cycle), each with its contract (format §4) and its Capability (§5.3). Table order is the order in which ready nodes start. If there is no confirmed actionable finding and the trend is stable, stop and report.
- REMEDIATE. Run the graph (§5). Each node makes the structural change its finding calls for, then confirms the changed functions preserved behavior. A verdict of unsafe or unknown blocks the node. A verdict that needs review, unsafe or unknown, or any defect outside the dependency graph, is a found issue (§5.4): the audit cannot see it, so the graph is its only record.
- RE-AUDIT. Audit again. A finding marked resolved that the structure contradicts is a regression and becomes a new node. Increase the cycle number and return to step 2.
The audit's refuted findings are carried forward, never dropped. A quality-loop graph has no authority-spec chain and no per-node premise check (the audit is the premise check); say so in its header.